Plunger pump installation instructions
Put the plunger pump on the foundation bed, measure horizontal adjustment, fasten plunger pump stand with anchor bolts(or not) in order to replace hydraulic oil and clean slurry feeding pipings, pump should be raise for 10cm higher than the ground, drainage for filtrate should be arranged around the pump foundation.
Full text reading please click this link: http://www.leofilterpress.com/filter_press/?295.html
